This Project consists of the replacement of approximately 640’ of existing 4” irrigation main line and approximately 550’ of existing 2” potable main line. The replacement lines will be located in the existing College access road. The water lines will be replaced with 4” PVC pipe for the main lines with new PVC laterals to reconnect to multiple existing service laterals and one future service lateral. The domestic waterline will consist of replacing galvanized pipes ranging from ¾” to 3” galvanized pipe, valves and fittings inside an existing below ground vault.
Engineer's Estimate is approximately $70,000.