Remove and discard the existing ¾” and ½” thick ply-sheathing flooring on the main theater stage, orchestra pit, and scene shop, and replace with new Plyron sheathing, per plans and specifications. Remove and discard existing scene shop maple painting grate, and replace with new maple painting grate per plans and specifications. Architects Estimate: $85,000.